ICS 27.140
CCS P 59 备案号:J2133— 2016
中国电力企业联合会标准
P T/CEC 5074—2022
抽水蓄能电站工程施工总进度
编制导则
Guide for general c onstruction schedule of pumped
storage power stations
2022-10-26 发布 2023-02-01 实施
中国电力企业联合会 发布 T/CEC
全国团体标准信息平台10mm
10 21mm
T/CEC 5074—2022
定价:89.00元
全国团体标准信息平台
中国电力企业联合会标准
抽水蓄能电站工程施工总进度
编制导则
Guide for general construction schedule of pumped
storage power stations
T/CEC 5074—2022
主编部门: 中国电力企业联合会
批准部门: 中国电力企业联合会
施行日期: 2023年2月1日
中国电力出版社
2023 北 京
全国团体标准信息平台
中国电力企业联合会标准
抽水蓄能电站工程施工总进度
编制导则
Guide for general construction schedule of pumped
storage power stations
T/CEC 5074—2022
*
中国电力出版社出版、印刷、发行
(北京市东城区北京站西街 19号 100005 http://www.cepp.sgcc.com.cn )
*
2023年5月第一版 2023年5月北京第一次印刷
850毫米× 1168毫米 32开本 4.375印张 115千字
*
统一书号 155198·4675 定 价 89.00元
版 权 专 有 侵 权 必 究
本书如有印装质量问题,我社营销中心负责退换 全国团体标准信息平台T/CEC 5074—2022
I 前 言
根据中国电力企业联合会 《关于印发 2020年第二批中国电力
企业联合会标准制修订计划的通知》 (中电联标准〔2020〕 183号)
的要求,导则编制组经广泛调查研究,认真总结实践经验,参考
有关国内先进标准,并在广泛征求意见的基础上,制定本导则。
本导则的主要技术内容是:筹建期及准备期工程施工进度、
导流工程施工进度、料源开采进度、土石方明挖工程施工进度、地基处理工程施工进度、混凝土工程施工进度、土石方填筑工程施工进度、地下工程施工进度、机电设备及金属结构安装进度、施工总进度编制、施工资源配置。
本导则由中国电力企业联合会负责管理,由中国电力企业联
合会标准化管理中心负责日常管理,由中国电力企业联合会抽水蓄能标准化技术委员会(CEC/TC 03 )负责具体技术内容的解释。
本导则为首次发布。 本导则由中国电力企业联合会抽水蓄能标准化技术委员会
(CEC/TC 03 )提出并归口。本导则在执行过程中的意见或建议反
馈至中国电力企业联合会标准化管理中心(北京市白广路二条一号,100761 ) 。
本导则主编单位:中国电建集团北京勘测设计研究院有限
公 司
本导则参编单位:中水东北勘测设计研究有限责任公司 国网新源控股有限公司抽水蓄能技术经济 研 究 院
本导则主要起草人员:吴朝月 谭红强 栾宇东 赵毅锋 郭 兴 王 博 李 巩 李 东 辉
王 俊 张怀芝 王世琦 王剑涛 郭冬娟 赵万青 朱智雷 姜殿成
全国团体标准信息平台T/CEC 5074—2022
II 王震洲 史有富 任韬哲 尚海龙
张雨豪 王 伟 蔡光哲 王富强
郑成宇 钟灿文 朱殿英 程 振
本导则主要审查人员:汪 毅 张正平 许要武 陈大鹏
李忠彬 楚跃先 郑桂斌 孙来成
巩平福 邱树先 宋守平 钱文勋
陈兆文 郭光文 杨铁荣 刘力捷
刘殿海 刘君成
全国团体标准信息平台T/CEC 5074—2022
III 目 次
1 总 则 ·····························································································1
2 术 语 ·····························································································2
3 筹建期及准备期工程施工进度 ··················································3
3.1 一般规定 ··············································································3
3.2 施工交通运输工程 ·······························································3
3.3 砂石料加工系统与混凝土生产系统 ····································4
3.4 钢管加工厂 ··········································································4
3.5 其他工程 ··············································································4
4 导流工程施工进度 ······································································5
4.1 一般规定 ··············································································5
4.2 导 流 ······················································································5
4.3 截 流 ······················································································6
4.4 基坑排水 ··············································································6
4.5 度汛及初期蓄水 ···································································6
5 料源开采进度 ·············································································7
5.1 一般规定 ··············································································7
5.2 土料场开采及加工 ·······························································7
5.3 砂砾石料场开采 ···································································7
5.4 石料场开采 ··········································································8
5.5 有用料利用 ··········································································8
6 土石方明挖工程施工进度 ··························································9
6.1 一般规定 ··············································································9
6.2 土方明挖 ··············································································9
6.3 石方明挖 ····
T-CEC 5074—2022 抽水蓄能电站工程施工总进度编制导则
文档预览
中文文档
14 页
50 下载
1000 浏览
0 评论
0 收藏
3.0分
温馨提示:本文档共14页,可预览 3 页,如浏览全部内容或当前文档出现乱码,可开通会员下载原始文档
本文档由 思安 于 2023-06-03 00:20:58上传分享