ICS 27.140 CCS P 59 备案号:J2133— 2016 中国电力企业联合会标准 P T/CEC 5072—2022 抽水蓄能电站高压压水试验规程 Code for high pressure packer test of pumped storage power station 2022-10-26 发布 2023-02-01 实施 中国电力企业联合会 发布 T/CEC 《电子编加稿件》 XM95148 责编:谭学奇 成品:140*203 责校:马宁 版心:104*160 字数:28*29 行 天25 地 18 订 19 切 17 ,描图:10 个 全国团体标准信息平台10mm 10 21mm T/CEC 5072—2022 定价:45.00元  全国团体标准信息平台 中国电力企业联合会标准 抽水蓄能电站高压压水试验规程 Code for high pressure packer test of pumped storage power station T/CEC 5072—2022 主编机构: 中国电力企业联合会 批准机构: 中国电力企业联合会 施行日期: 2023年02月01日 中国电力出版社 2023 北 京 全国团体标准信息平台 中国电力企业联合会标准 抽水蓄能电站高压压水试验规程 Code for high pressure packer test of pumped storage power station T/CEC 5072—2022 * 中国电力出版社出版、印刷、发行 (北京市东城区北京站西街 19号 100005 http://www.cepp.sgcc.com.cn ) * 2023年2月第一版 2023年2月北京第一次印刷 850毫米× 1168毫米 32开本 2.125印张 55千字 * 统一书号 155198·4594 定 价45.00元 版 权 专 有 侵 权 必 究 本书如有印装质量问题,我社营销中心负责退换 全国团体标准信息平台T/CEC 5072—2022 I 前 言 根据中国电力企业联合会(中电联标准〔 2020〕55 号) 《关 于印发 2020 年第一批中国电力企业联合会标准制修订计划的通 知》的要求,标准编制组经广泛调查研究,认真总结实践经验, 在广泛征求意见的基础上,制定本规程。 本规程共 8章和 5个附录,主要技术内容有:高压压水试验 布置、高压压水试验孔、高压压水试验方法与压力、高压压水试验设施、高压压水现场试验、试验资料整理。 本规程由中国电力企业联合会抽水蓄能标准化技术委员会 (CEC/TC 03 )提出并归口。 本规程主编单位:中水东北勘测设计研究有限责任公司 本规程参编单位:上海勘测设计研究院有限公司 本规程主要起草人员:冯 伟 李占军 田作印 赵海阔 佘小光 陈 波 郑以宝 杨让全 于景宗 杜金良 高宏志 康家亮 刘秀宝 李保方 王 浩 杨晓晗 周海峰 朱金来 赵金双 杨瑞刚 李 松 史海燕 于洪翔 本规程主要审查人员:汪 毅 张亚武 张正平 许要武 章 鹏 李忠彬 李 冰 蒋逵超 吴朝月 赵 轶 汤飞熊 赵国刚 邱树先 贾 巍 马 鹏 黄火林 钱文勋 杨铁荣 陈兆文 赵贤学 刘殿海 柴建峰 本文件在执行过程中的意见或建议反馈至中国电力企业联合 会标准化管理中心(北京市白广路二条一号,100761 ) 。 全国团体标准信息平台T/CEC 5072—2022 II 目 次 1 总 则 ···························································································· 1 2 术 语 ···························································································· 2 3 高压压水试验布置 ····································································· 3 3.1 试验孔布置 ·········································································· 3 3.2 试验段布置 ·········································································· 3 4 高压压水试验孔 ········································································· 4 4.1 试验孔场地 ·········································································· 4 4.2 试验孔钻进 ·········································································· 4 5 高压压水试验方法与压力 ························································· 6 5.1 试验方法 ············································································· 6 5.2 试验压力 ············································································· 6 6 高压压水试验设施 ····································································· 8 6.1 高压止水栓塞 ······································································ 8 6.2 高压水泵 ············································································· 8 6.3 高压稳压罐 ·········································································· 8 6.4 高压压力传感装置 ······························································ 9 6.5 高压压力表 ·········································································· 9 6.6 高压流量计 ·········································································· 9 6.7 高压管路 ············································································· 9 7 高压压水现场试验 ··································································· 10 7.1 试验准备 ··········································································· 10 7.2 试验设备安装及检查 ························································ 10 7.3 水位观测 ··········································································· 10 7.4 试验段隔离 ·········································································11 7.5 压力和流量观测 ·································································11 全国团体标准信息平台T/CEC 5072—2022 III 7.6 现场试验成果检查 ···········

pdf文档 T-CEC 5072—2022 抽水蓄能电站高压压水试验规程

文档预览
中文文档 10 页 50 下载 1000 浏览 0 评论 0 收藏 3.0分
温馨提示:本文档共10页,可预览 3 页,如浏览全部内容或当前文档出现乱码,可开通会员下载原始文档
T-CEC 5072—2022 抽水蓄能电站高压压水试验规程 第 1 页 T-CEC 5072—2022 抽水蓄能电站高压压水试验规程 第 2 页 T-CEC 5072—2022 抽水蓄能电站高压压水试验规程 第 3 页
下载文档到电脑,方便使用
本文档由 思安2023-06-03 00:20:58上传分享
给文档打分
您好可以输入 255 个字符
网站域名是多少( 答案:github5.com )
评论列表
  • 暂时还没有评论,期待您的金玉良言
热门文档
站内资源均来自网友分享或网络收集整理,若无意中侵犯到您的权利,敬请联系我们微信(点击查看客服),我们将及时删除相关资源。